NOTE: If you have an Apple computer, you will need to convert your MAC .numbers file into a Microsoft Excel file. Here is a video on how-
Land Development-A Land Development permit application is required prior to the development of a site.
The Land Development Permit provides the linear footage or acreage for all new infrastructure (sidewalks, sanitary sewer, drainage) on a site and inspection fees are based off of this information. This permit must be submitted prior to development. For any new landscaping, a Landscape Permit with a landscape plan showing all proposed plants (trees and shrubs) and quantities will be required.
Demolition and Removal-
A Demolition Permit is required prior to demolishing or removing any building or structure that required a building permit for the initial construction. Any requirements of the State of Colorado must also be satisfied. Prior to the removal of trees that are not dead, dying or diseased, a Tree Removal Permit must be submitted and approved. Control of disturbed surface areas is required for all development. Methods to control dust emissions must be provided on the Dust Control Permit
Road & Traffic
Traffic control measures, jacking and boring, and/or creating a road cut can be applied for with a Right-of-Way Construction Permit .